LUZON |
Angat Watershed Community Alleviation and Restoration of Ecosystems Support and Access to Sustainable Financing Mechanisms |
Tanim Kalikasan |
Php 2,000,000.00 |
July 2017 to July 2018 |
Closed |
|
Asserting the Rights of Sibuyan Mangyan Tagabukid (SMT) over their Ancestral Domain in |
Asosasyon ng Tribong Sibuyan Mangyan Tagabukid (ATSMT) |
PhP 250,000 |
June 2015 to December 2015 |
Closed |
|
Awareness Campaign on UC-?EC and ER 1-?94 as Sustainable Financing Mechanism for the Ancestral Domain Owners Situated Upstream of the NPC-? Managed and other Hydro-?Power Plant in Mindanao |
BUHITA & BUKDA |
Php 498,000.00 |
June 2017 to June 2018 |
Closed |
|
Banao Indigenous Community Conserved Area |
Concerned Citizens of Abra for Good Governance (CCAG) |
PhP 1,857,000.00 |
October 2013 to December 2014 |
Closed |
|
Banao Watershed Community-Based Resource Management Project (Formation Phase - Year 1) |
Concerned Citizens Of Abra for Good Government |
1,255,500.00 |
July 2004 to June 2005 |
Closed |
|
Biak Na Bato National Conservation Project |
Miriam PEACE |
1,062,525.00 |
February 2003 to January 2004 |
Closed |
|
Biak na Bato National Park Conservation Project |
Buklod Unlad Ng Dalitang Umaasa Sa Kalikasan (BUNDUK) |
858,500.00 |
February 2006 to March 2007 |
Closed |
|
Biak Na Bato National Park Conservation Project |
Buklud Unlad Ng Dalitang Umaasa Sa Kalikasan (BUNDUK) |
663,400.00 |
February 2004 to January 2005 |
Closed |
|
Biak Na Bato National Park Conservation Project (Phase 2-Year 5) |
Miriam-P.E.A.C.E. |
1,160,987.50 |
February 2002 to January 2003 |
Closed |
|
Biak na Bato National Park Conservation Project (PO-Managed Phase) |
Buklod-Unlad Ng Dalitang Umaasa Sa Kalikasan (BUNDUK) |
1,441,700.00 |
February 2005 to January 2006 |
Closed |
|
Biak Na Bato National Park Conservation Project (Year 4) |
Miriam-P.E.A.C.E. |
1,485,475.00 |
February 2001 to January 2002 |
Closed |
|
Biak-na-Bato National Park Conservation Project (Year 2) |
Miriam PEACE |
1,804,500.00 |
July 1998 to June 1999 |
Closed |
|
Biak-na-Bato National Park Conservation Project (Year 3) |
Miriam PEACE |
0.00 |
October 1999 to November 2000 |
Closed |
|
Biak-na-Bato Post Site Focused Intervention |
FPE |
PhP 200,000 |
June 2013 to December 2014 |
Closed |
|
Bio-Physical Baseline Research on Sibuyan Island |
Lichel Technologies Inc (LTI) |
799,680.00 |
September 2017 to January 2018 |
Closed |
|
Bio-?Physical Baseline Research in Sibuyan Island |
Lichel Technologies, Inc. |
Php 799,680.00 |
September 2017 to September 2018 |
Closed |
|
Bolos Community-Based Resource Management Project |
Cagayan Valley Partners In People Development |
1,413,500.00 |
January 2004 to January 2005 |
Closed |
|
Bolos Point Community-Based Resource Management Project |
Cagayan Valley Partners in People Development |
1,370,100.00 |
January 2001 to January 2002 |
Closed |
|
Bolos Point Community-Based Resource Management Project |
Cagayan Valley Partners in People Development (CAVAPPED) |
1,237,600.00 |
January 2002 to January 2003 |
Closed |
|
Bolos Point Community-Based Resource Management Project - Phase 1 Year 2 |
Cagayan Valley Partners In People Development (CAVAPPED) |
1,196,460.00 |
January 2003 to January 2004 |
Closed |
|
Case Study of PCART's STARTREK Project |
FPE-LRU |
180,000 |
April 2016 |
Closed |
|
Case Study on STARTREK Project |
LRU-?Pro active |
Php 100,000.00 |
April 2016 to April 2017 |
Closed |
|
Climate Change Mitigation through Agroforestry Development |
Montanosa Research & Development Center (MRDC) |
Php 200,000.00 |
May 2016 to September 2016 |
Closed |
|
Community Lapat-Based Biodiversity Consevation Of Buasao Watershed and Mt. Poswey |
Tipon Iti Umili Para Ti Panangsaluad Ti Nakaparsuan |
908,850.00 |
June 2008 to June 2009 |
Closed |
|
Community Organizing, IEC, and Advocacy on Resource Management of Banao Watershed |
Concerned Citizens of Abra for Good Government |
150,000.00 |
July 2006 to September 2006 |
Closed |
|
Community-Based Biodiversity Conservation of Buasao Watershed and Mount Poswey Year 3 Phase 3 |
Tipon Ti Umili Para Iti Panangsaluad Iti Nakaparsuan |
957,500.00 |
December 2006 to December 2007 |
Closed |
|
Community-Based Biodiversity Conservation of Buasao Watershed and Mt. Poswey Implementation Phase |
Concerned Citizen of Abra for Good Government (CCAGG) |
696,859.80 |
October 1997 to April 1998 |
Closed |
|
Community-Based Biodiversity Conservation of Buasao Watershed and Mt. Poswey Year 1 |
Concerned Citizen of Abra for Good Government (CCAGG) |
1,767,842.00 |
April 1999 to April 2000 |
Closed |
|
Community-Based Biodiversity Conservation of Buasao Watershed and Mt. Poswey Year 2 |
Concerned Citizens of Abra on Good Government |
1,796,346.00 |
April 2000 to April 2001 |
Closed |
|
Community-Based Biodiversity Conservation of Buasao Watershed Year 4 Phase 2 |
Concerned Citizens of Abra for Good Government (CCAGG) |
1,131,017.40 |
July 2002 to June 2003 |
Closed |
|
Community-Based Coastal Resource Management and Biodiversity Conservation |
Palawan Community-Based Fisherfolk Alliance |
930,875.00 |
December 2006 to December 2007 |
Closed |
|
Community-Based Resource Management Project for the Banao Watershed |
Concerned Citizens Of Abra On Good Government |
428,000.00 |
April 2006 to July 2007 |
Closed |
|
Conduct of RSEA and Fulfillment of Data Gaps for KPNP |
UPLB-Museum of Natural History |
501,000.00 |
April 2018 |
Closed |
|
Conservation Management Planning Workshop for Pagudpud |
Pro Active |
Php 200,000.00 |
July 2018 to August 2018 |
Closed |
|
Conservation Programming in Sites and Other Conservation Areas |
National and Luzon Operations |
328,600 |
January 2018 to January 2019 |
Closed |
|
Demonstration and Distribution of Organic Fertilizer Products |
CAANDUYOG |
200,000 |
June 2016 |
Closed |
|
Empowering Communities for Local Conservaiion Areas M anagemenl |
Polillo lslands Biod iversity Conservation Foundation, lnc. (P IBCFI) |
PhP 1,000,000.00 |
September 2015 to September 2016 |
Closed |
|
Empowering Communities for Local Conservation Areas Management |
Polillo lslands Biodiversity Conservation Foundation, lnc. (PIBCFI) |
PhP 1,000,000 |
August 2015 |
Closed |
|
Enhancing Biodiversity Conservation in Busuanga, Palawan by Communities |
Community Centered Conservation – Philippines, Inc. (C3) |
TBD |
March 2014 to May 2015 |
Closed |
|
Expanding the Habitat and Scaling-up the Social Enterprise (Star Trek Project Phase II) |
Palawan Center for Appropriate Technology (PCART) |
PhP 2,000,000 |
December 2014 to December 2015 |
Closed |
|
Expanding the Habitat and Scaling-up the Social Enterprise (Star Trek Project Phase II) |
Palawan Center for Appropriate Technology (PCART) |
PhP 2,000,000.00 |
October 2013 to December 2014 |
Closed |
|
Field Guide and Database of Bulusan Volcano National Park Biodiversity Monitoring System |
Likas para sa Kalusugan ng Sambayanan, Inc. |
50,000.00 |
February 2003 to May 2003 |
Closed |
|
Fisherfolk Integrated Self Help for Empowerment and Regeneration Project |
Haribon- Palawan |
944,750.00 |
July 1999 to July 2000 |
Closed |
|
Fisherfolk Integrated Self-Help for Empowerment and Regeneration |
Haribon Palawan |
1,061,680.00 |
September 2003 to August 2004 |
Closed |
|
Fisherfolk Integrated Self-Help for Empowerment and Regeneration (PO-Managed Year 1) |
Palawan Community-Based Fisherfolk Alliance, Inc. |
1,033,950.00 |
September 2004 to August 2005 |
Closed |
|
Forest Protection Program |
Brgy. Lalo Tapat Kailkasan Association, Inc. (TAPAT) |
Php 200,000.00 |
April 2017 to April 2018 |
Closed |
|
FPE Post-MIPPEG Support Project |
FPE-LRU |
Php 650,000.00 |
June 2015 to December 2015 |
Closed |
|
FPE Sibuyan Post MIPPEG Support Project Support |
FPE-LRU |
PhP 650,000 |
June 2015 to September 2015 |
Closed |
|
Gabriela Multipurpose Cooperative Rehabilitation of Reforestation Site |
Gabriela Multi-Purpose Cooperative |
128,000.00 |
July 2013 to March 2014 |
Closed |
|
Green Schools-?Ilocos Norte: Educator School-?Based Environment Education Empowerment Program |
Educator Division of Alchemy Creative Communications Studio |
Php 800,000.00 |
June 2017 to June 2018 |
Closed |
|
Indigenous and Community Conserved Areas (ICCA) of Banaos in Balbalan, Kalinga |
Banao Bodong Tribal Association (BBTA) Concerned Citizens of Abra for Good Government (CCAGG) |
Php 1,043,600.00 |
February 2017 to February 2018 |
Closed |
|
Indigenous Community Conserved Areas (ICCA) of Banaos in Balbalan, Kalinga - PO Managed |
Banao Bodong Tribal Association (BBTA) and Concerned Citizens of Abra for Good Government. Inc. (CCAGG) |
1,043,600.00 |
April 2017 to April 2018 |
Closed |
|
Indigenous Community Conserved Areas (ICCA) of Banaos in Malibcong, Abra |
Concerned Citizens of Abra for Good Governance |
PhP 1,400,000 |
January 2016 to January 2017 |
Closed |
|
Integrated Biodiversity Conservation and Sustainable Management of Ancestral Domains in the Zambales Mountain Range YEAR 2 |
Pederasyon ng mga Aytang Samahan sa Zambales (PASS) |
988,000.00 |
October 2002 to September 2003 |
Closed |
|
Integrated Biodiversity Conservation and Sustainable Management of Ancestral Domains in Zambales Mountain Range Year 3 |
Pederasyon Ng Mga Aytang Samahan Sa Sambales (PASS) |
732,240.00 |
October 2003 to September 2004 |
Closed |
|
Integrated, Biodersity Conservation and Sustainable Management of Ancestral Domains in the Zambales Mountain Range |
Pederasyon ng mga Aytang Samahan sa Sambales |
1,650,000.00 |
October 2001 to September 2002 |
Closed |
|
Malanas-Balbalasang Watershed Development Plan and CBRM Formulation |
Sibol ng Agham at Teknolohiya (SIBAT) |
1,076,000.00 |
October 2002 to September 2003 |
Closed |
|
Marine Corridor Network Building Towards Sustainable Management of Coastal Resources in the West Philippine Sea |
Haribon Palawan |
PhP 1,572, 850 |
July 2013 to December 2014 |
Closed |
|
Moving Towards Sibuyan Island Conservation Management Plan |
Bayay Sibuyanon (BSI) |
PhP 200,000 |
February 2016 to April 2016 |
Closed |
|
Mt. Banahaw de Tayabas Forest Protection Project |
Brgy. Lalo Tapat Kalikasan Association, Inc. |
200,000.00 |
January 2016 to January 2017 |
Closed |
|
Mt. Bulusan National Park Community-Based Resource Development Program Transition Period |
Lingap para sa Kalusugan ng Sambayanan (LIKAS) |
586,093.56 |
July 1999 to October 1999 |
Closed |
|
Mt. Bulusan National Park Community-Based Resource Development Program Year 2 |
Lingap para sa Kalusugan ng Sambayanan (LIKAS) |
1,857,024.00 |
July 1997 to June 1998 |
Closed |
|
Mt. Bulusan National Park Community-Based Resource Development Program Year 3 |
Lingap para sa Kalusugan ng Sambayanan (LIKAS) |
2,042,116.64 |
July 1998 to June 1999 |
Closed |
|
Mt. Bulusan National Park Community-based Resource Management Program Year 1 |
Lingap para sa Kalusugan ng Sambayanan (LIKAS) |
2,305,420.00 |
April 1996 to March 1997 |
Closed |
|
Mt. Bulusan Volcano Exploring Partnership Project |
FPE |
PhP 200,000.00 |
June 2013 to December 2014 |
Closed |
|
Mt. Bulusan Volcano National Park Community-Based Resource Management - Phase 2 Year 4 |
Lingap para so Kalusugan ng Sambayanan, Inc. |
1,300,000.00 |
May 2000 to April 2001 |
Closed |
|
Mt. Bulusan Volcano National Park Community-Based Resource Management Project Year 1-PO Managed |
Pederasyon ng Nagkakaisang Samahan ng Bundok Bulusan (PNAGSAMA) |
697,315.00 |
January 2003 to December 2003 |
Closed |
|
Mt. Bulusan Volcano National Park Community-Based Resource Management Project Year 5 |
Lingap para sa Kalusugan ng Sambayanan (LIKAS) |
1,337,584.69 |
October 2001 to December 2002 |
Closed |
|
Mt./Lake Bulusan Biodiversity Conservation Planning Project |
Lingap para sa Kalusugan ng Sambayanan (LIKAS) |
30,000.00 |
January 1995 to December 1995 |
Closed |
|
Naguilian Watershed Forest Reserve Rainforestation Management and Community Development Project |
Health, Education, Environment, Discipleship (HEED) |
PhP 627,205 |
March 2015 to July 2015 |
Closed |
|
National Genetic Conservation Program: Integrated Seed-Banking Expansion (Year 2) |
Sibol ng Agham at Teknolohiya (SIBAT), Inc |
1,024,080.00 |
May 1997 to February 2000 |
Closed |
|
NWFR Rainforestation Management and Community Development Project |
Health, Education, Environment, Discipleship (HEED) |
PhP 627, 205.00 |
March 2015 to March 2016 |
Closed |
|
Pag-Oorganisa at Pagpapatayo ng Pamprobinsyang Samahan ng Mangingisda sa Bataan |
Pinagkaisang Lakas Ng Mangingisda Sa Bataan |
47,200.00 |
March 2004 |
Closed |
|
Pagkabuhi kag Fagpadayon ng mga Gawi kag Kinamatarong ng Sibuyan Mangyan Tagabukid" ("Pagsasabuhay at Pagpapatuloy ng mga Kinagawian at Karapatan ng mga Sibuyan Mangyan Tagabukid") |
ASOSASYON NG TRIBONG SIBUYAN MANGYAN TAGABUKID (ATSMT) |
800,000.00 |
August 2017 to May 2018 |
Closed |
|
Pagpapalakas ng Samahan at Organic Farming |
Barangay Bukal Vegetable Planters Association (BBVPA) |
Php 91,000.00 |
July 2017 to July 2018 |
Closed |
|
Rainforestation Program for Aeta Upland Community |
Philippine Disaster Risk Reduction Network (PDRRN)/Kalipunan Ng Mga Liping Ayta Ng Lupaing Ninuno, Inc. (KALIPI) |
800,000.00 |
December 2011 to May 2013 |
Closed |
|
Rehabilitation and Development of Watershed cum Nursery Establishment (Indigenous Species and Fruit Bearing Trees) as Income-Generating Project of Brgy. Pedlisan, Maddela, Quirino |
Saint Joseph Savings and Development Cooperative |
708,714.00 |
January 2013 to March 2014 |
Closed |
|
Research in Data Gaps in Sibuyan Island: Socio-?Economic Component |
Lichel Technologies, Inc. |
Php 537,600.00 |
June 2017 to June 2018 |
Closed |
|
RSEA and Fulfillment of Data Gaps for KPNP |
UPLB-Museum of Natural History |
Php 501,000.00 |
January 2018 to January 2019 |
Closed |
|
Short-Term Proposal for Bolos Community Resource Management |
Cagayan Valley Partners In People Development |
328,075.00 |
July 2007 to September 2007 |
Closed |
|
Sibuyan Island Conservation Planning Workshop |
FPE-LRU |
PhP 200,000 |
August 2015 |
Closed |
|
Site-Focus Area Support Projects for Sibuyan Island and Kalbario-Patapat |
FPE-LRU |
PhP 800,000 |
December 2015 to January 2017 |
Closed |
|
Socio-Economic Baseline/Data Gaps Reseach in Kalbario-Patapat Natural Park |
Ilocos Norte Center for Research, Empowerment and Development (ICRED) |
500,000.00 |
October 2017 to January 2018 |
Closed |
|
Socio-?Economic Baseline/Data Gaps Research in Kalbario Patapat Natural Park |
Ilocos Norte Center for Research, Empowerment, and Development (ICRED) |
500,000.00 |
September 2017 to September 2018 |
Closed |
|
Star Trek Phase II Year 3 |
PCART |
PhP 2,000,000.00 |
March 2016 to March 2017 |
Closed |
|
STARTREK (Phase II Year 3) Exploring Habitat sand Scaling Up Social Enterprise |
Palawan Center for Appropriate Rural Technology Inc. (PCART) |
2,000,000 |
June 2016 to May 2017 |
Closed |
|
StarTrek II Year 3: Expanding the Habitat and Scaling up the Social Enterprise |
Palawan Center for Appropriate Rural Technology (PCART) |
1,993,363.00 |
January 2017 to January 2018 |
Closed |
|
StarTrek III |
PCART |
Php1,993,363.00 |
February 2018 to February 2019 |
Closed |
|
StarTrek-Phase II, Year 2 |
Palawan Center for Appropriate RuralTechnology, Inc. (PCART) |
Php 2,000,000.00 |
January 2015 to December 2015 |
Closed |
|
Tree Planting and Organic Farming |
Barangay Silangan Lazaan Upland Vegetable Farmers Association (BSLUVFA) |
Php 100,000.00 |
June 2017 to June 2018 |
Closed |
VISAYAS |
A Proposed MPA Management and Ecotourism Systems Learning Visit to Mantalip Reef |
Olang Coastal Resource Management Group |
100,000 |
January 2017 to January 2018 |
Closed |
|
Biodiversity Conservation Framework Development and Strategic Planning for Sicogon and Gigantes Islands, Carles, Iloilo |
Iloilo Caucus of Development Non-Government Organizations (I-CODE), Inc. |
799,300.00 |
October 2012 |
Closed |
|
Building Conservation Strategies and Management for the Mt. Nacolod Mountain Ranges |
South Pacific Integrated Development Foundation, Inc. (SPIADFI) |
Php 2,000,000.00 |
February 2017 to February 2018 |
Closed |
|
Building Convergence Model towards Institutionalizing Conservation Strategies and Management for the Mt. Nacolod Mountain Ranges |
South Pacific Integrated Area Development Foundation, Inc. (SPIADFI) |
2,000,000 |
May 2017 to May 2019 |
Closed |
|
Building Resilient and Sustainable Small Island Communities |
UP Visayas Foundation, lnc. |
Php 2,000,000.00 |
May 2016 to May 2017 |
Closed |
|
Central Cebu Protected Area Stakeholders Assembly 2018 |
Soil & Water Conservation Foundation (SWCF) Inc. |
32,500.00 |
January 2017 to January 2018 |
Closed |
|
Community-based Coastal Resource Management Project for the South Eastern Coastal Communities of the Province of Eastern Samar-Year 3 |
SEASPOC |
PhP 1,650,000.00 |
December 2008 to December 2009 |
Closed |
|
Community-Based Resource Management and Sustainable Livelihood Development-Phase I |
Ecological & Agricultural Development Foundation, Inc. (Eco-Agri) |
100,000.00 |
April 2018 to July 2018 |
Closed |
|
Conservation Management Workshop - Mt. Nacoolod Key Biodiversity Area |
FPE-VRU |
PhP120,700 |
May 2015 |
Closed |
|
Dahon, Tubig, Kalibutan Leaf, Water, Earth: A Collection of Environmental Poetry |
Basaranan nga Boses han San Isidro (BOSIS) |
Php 80,000.00 |
June 2017 to June 2018 |
Closed |
|
Engaging Stakeholders to Protect and Conserve Mt. Nacolod through Environmental Education and Awareness |
Philippine College of Physician-? Eastern Visayas Chapter Co-?Proponent: Green Circle Southern Leyte |
Php 556,635.00 |
April 2017 |
Closed |
|
Establishing Baselines for Managing the Gigantes Island MPA System |
VRU Proactive |
Php210,000 |
March 2018 to March 2019 |
Closed |
|
Establishing Baselines for Managing the Gigantes Island MPA System |
Dr. Wilfredo L. Campos |
Php210,000 |
March 2018 to March 2019 |
Closed |
|
Establishment of a Bio-fence at the Mananga Watershed Forest Reserve – Year 1 |
aCebu Biodiversity Conservation Foundation Inc. (CBCF) |
1,988,000.00 |
December 2011 to December 2012 |
Closed |
|
Forest and Cropland Ecosystems Rehabilitation through Environpreneurship |
Federation of Multi-Sectoral Alliance for Development (MUAD- Negros) |
200,000 |
May 2016 to May 2017 |
Closed |
|
Forest and Croplands Ecosystems Rehabilitation thru Environpreneurship |
Federation of Multi-?Sectoral Alliance for Development-?Negros (MUAD-?Negros) |
Php 200,000 |
April 2016 to April 2017 |
Closed |
|
Forum/Workshop on the Conservation of Gigantes Island Caves |
FPE-VRU |
PhP 73,150 |
May 2015 |
Closed |
|
Ilog Hilabangan Watershed and Forest Reserve Sustainable Protection through Community Engagement |
Ecological and Agricultural Development Foundation Inc. (EcoAgri) |
200,000 |
June 2016 to December 2016 |
Closed |
|
Impact Evaluation of Mt. Talinis/Twin Lakes |
FPE |
PhP 350,000.00 |
June 2013 to December 2014 |
Closed |
|
Integrated Area Conservation and Resource Enhancement (I-CARE) Year 3 PO-Managed |
Third District Development Alliance of Resource Managers (TDDARM), Inc. |
1,562,400.00 |
October 2012 to October 2013 |
Closed |
|
Mainstreaming Local Conservation in the Southwestern Cebu Key Biodiversity Area |
Mag-Uugmad Foundation, Inc. (MFI) |
Php 400,000.00 |
July 2017 to July 2018 |
Closed |
|
Mt. Nacolod Resource Economic Valuation |
Visayas State University (VSU) |
200,000 |
January 2018 to January 2019 |
Closed |
|
Post Yolanda Ecosystem Rehabilitation for Disaster Resilient and Sustainable Community of Kinatarkan Island |
Southern Partners and Fair Trade Center (SPFTC), Inc. |
PhP 800,000 |
October 2014 to August 2015 |
Closed |
|
Post Yolanda Ecosystem Rehabilitation for Disaster Resilient and Sustainable Community of Kinatarkan Island |
Southern Partners and Fair Trade Center (SPFTC), Inc. |
PhP 800,000.00 |
October 2014 |
Closed |
|
Promoting Biodiversity Conservation and Sustainable Agriculture Project |
Federation of Multi-sectoral Alliance for Development – Negros |
2,000,000.00 |
November 2011 to November 2013 |
Closed |
|
Refining Biodiversity Conservation targets in High Value Conservation Areas (HCVA) in the Mt. Nacolod Landscape |
South Pacific lntegrated Development Foundation, lnc. (SPIADFI) |
PhP 1,673,600 |
September 2015 to September 2016 |
Closed |
|
Refining Blodiversity Conservation Targets in High Value Conservation Areas (HCVA) in the Mt. Nacolod Landscape |
South Pacific lntegrated Development Foundation, lnc. (SPIADFI) |
PhP 1,673,600.00 |
September 2015 to September 2016 |
Closed |
|
Southern Cauayan Forest Reserve Biodiversity Conservation |
Ecological and Agricultural Development Foundation, Inc. (EcoAgri) |
617,300.00 |
January 2012 to December 2012 |
Closed |
|
Southern Negros Cauayan Forest Reserve Biodiversity Conservation (Phase 2) |
Ecological and Agricultural Development Foundation, Inc. (Eco-Agri) |
PhP 1,552,900.00 |
July 2013 to December 2014 |
Closed |
|
Sta. Catalina Biodiversity Project |
Sta. Catalina Bukidnon Tribe Association |
PhP 425,000.00 |
October 2009 |
Closed |
|
Strengthening Community Participation of Peoples Organization of Brgy. Pansaan Towards Protection of Mt. Nacolod Range |
Brgy. Pansaan Reforestation Organization (BPRO) |
PhP 200,000 |
June 2015 to August 2015 |
Closed |
|
Strengthening Multi-stakeholder Convergence for Gigantes, Carles |
UP Visayas Foundation Inc. (UPVFI) |
150,700 |
July 2015 to October 2015 |
Closed |
|
Strengthening Multistakeholder Convergence for Gigantes, Carles |
UPV Foundation, Inc. |
PhP 150,700 |
July 2015 to January 2016 |
Closed |
|
Study on the Outcomes of the Bohol Marine Triangle Project |
FPE |
PhP 400,000.00 |
June 2013 to December 2014 |
Closed |
|
Sustainable Tourism Planning for Gigantes |
FPE-VRU |
85,640.00 |
August 2017 |
Closed |
|
Sustaining Forest Conservation and Protection Initiatives of Local Communities in Ilog Hilabangan Watershed and Forest Reserve(IHWFR) |
Buenavista Upland Tree Grower in Watershed Association (BUTWA) |
550,000 |
December 2016 to December 2018 |
Closed |
|
VRO Operational Planning and Sites Programming |
Visayas Regional Operations |
200,000 |
January 2018 to January 2019 |
Closed |
MINDANAO |
Abaca Production |
INAJAW Peoples Organization |
PhP 108,100 |
September 2014 to October 2014 |
Closed |
|
Agroforestry Development for Watershed Rehabilitation and Climate Change Mitigation within the Headwaters of Pulangi River |
Bukidnon Higaonon Tribal Association (BUHITA) |
Php 100,000.00 |
July 2018 to August 2019 |
Closed |
|
Agusan Marsh CMP Presentation and Commitment Building |
FPE-MRU |
PhP 70,000 |
November 2015 |
Closed |
|
Agusan Marsh CMP Review and Polishing |
FPE-MRU |
250,000 |
October 2016 to November 2016 |
Closed |
|
Agusan Marsh Stakeholders Conservation Management Planning |
FPE-MRU |
PhP 350,000 |
July 2015 to September 2015 |
Closed |
|
Agusan Marsh Stakeholders Conservation Management Planning Workshop |
FPE-MRU |
PhP 150,000 |
August 2015 |
Closed |
|
Arakan Forest Corridor Development Program: Restoring Habitats Through Wildlife Stepping Stones |
Philippine Eagle Foundation, Inc. (PEFI) |
PhP 1,916,680 |
November 2014 to December 2015 |
Closed |
|
BCSD Project in SK Pendatum, Ligawasan Yr. 3 |
Maguindanaon Development Foundation, Inc. (MDFI) |
PhP 1,958,600.00 |
November 2012 to December 2013 |
Closed |
|
Enhancing the Results of Forest Restoration Efforts within the Panigan-?Tamugan Watershed in Baguio District, Davao City |
Interface Development Interventions (IDIS) |
Php 800,000.00 |
June 2017 to June 2018 |
Closed |
|
Impact Evaluation of Dinagat Project |
FPE |
PhP 350,000.00 |
June 2013 to December 2014 |
Closed |
|
Impact Evaluation of MICADEV/Mt. Matutum Project |
FPE |
PhP 350,000.00 |
June 2013 to December 2014 |
Closed |
|
Increase Community Participation on Mangrove Protection and Reforestation through Provision of Livelihood on Mud Crab and Grouper Livelihood |
Bulawan Mangrove Builders Association (BMBA) |
PhP 200,000 |
October 2014 to November 2014 |
Closed |
|
Increase Community Participation on Mangrove Protection and Reforestation through Provision of Livelihood on Mud Crab and Grouper Livelihood |
Bulawan Mangrove Builders Association (BMBA) |
PhP 200,000.00 |
October 2014 to October 2015 |
Closed |
|
Increase Community Participation on Mangrove Protection and Reforestation through Provision of Livelihood on Mud Crab and Grouper Livelihood |
Tayuman Kasung Mangrove Planters Association (TKMPA) |
PhP 200,000.00 |
October 2014 to October 2015 |
Closed |
|
Increase Community Participation on Mangrove Protection and Reforestation through Provision of Livelihood on Mud Crab and Grouper Livelihood in Sitio Tayuman, Kasung, , |
Tayuman Kasung Mangrove Planters Association (TKMPA) |
PhP 200,000 |
October 2014 to November 2014 |
Closed |
|
Increase Community Participation on Wildcrafted Nipa Protection and Conservation Management in Baksanan Creek, Barangay Sinipak, Datu Blah Sinsuat, Maguindanao through Provision of Alternative Livelihood |
Development Consultants, Inc. (DEVCON) |
200,000 |
January 2016 to January 2017 |
Closed |
|
Increase the Reduction of Hazards and Threats through Preparedness and Alternative Indigenous Technologies Along the River Systems of Allah and Safali Rivers (I-RePAIR) Project |
Tribal Leaders Development Foundation, Inc. (TLDFI) |
Php 1,999,720.00 |
February 2017 to February 2018 |
Closed |
|
Increasing the Reduction of Hazards and Threats through Preparedness and Alternative Indigenous Technologies Along the River Systems of Allah and Safali Rivers (i-RePAIR) |
Tribal Leaders Development Foundation, Inc. (TLDFI) |
1,999,720 |
February 2017 to January 2018 |
Closed |
|
Increasing Tree Nursery Production |
TAPI-AN Development Association (TADEAS) |
PhP 124,927 |
September 2014 to October 2014 |
Closed |
|
Increasing Tree Nursery Production |
TAPI-AN Development Association (TADEAS) |
Php 124,927.00 |
September 2014 |
Closed |
|
Integrated Biodiversity Conservation and Sustainable Development Project of the Lake Mainit Year 3 |
Green Mindanao Association, Inc. |
1,547,500.00 |
April 2009 to April 2010 |
Closed |
|
Ipil Coastal Communities Climate Change Mitigation Project |
Xavier Science Foundation/ Xavier Agriculture Extension Service (XSF/XAES) |
PhP 200,000.00 |
August 2013 to March 2014 |
Closed |
|
Laglagan Mountain and Water Head Source Rehabilitation and Protection by Planting Indigenous Tree Species and Bamboo Along Riverbank Covering Salug, Maputi Creek and Other Minor and Major Tributaries |
Indigenous People's Center for Development Services, Inc. (IPCDS) |
PhP 150,000.00 |
August 2013 to February 2014 |
Closed |
|
Ligawasan Marsh Strategic Plan Review Workshop |
Maguindanaon Development Foundation, Inc. (MDFI) |
275,000.00 |
January 2009 |
Closed |
|
MAFIA Fishing lndustry (Acquisition of Patrol Boat) |
Marginalized Fisherfolks Association |
PhP 93,000.00 |
September 2014 |
Closed |
|
MAFIA Fishing lndustry and Acquisition of Patrol Boat |
Marginalized Fisherfolks Association (MAFIA) |
PhP 93,000 |
September 2014 to October 2014 |
Closed |
|
MALUPA Training on Proposal Making for the Formulation o f ADSDPP on Tinanannon Ancestral Domain |
PANLIPI |
PhP 25,000.00 |
October 2014 to October 2015 |
Closed |
|
Mangrove Forest Conservation through Continuous Enhancement Planting, Maintenance andProtection in the Seven Barangays of Ipil, Zamboanga Sibugay |
Xavier Agriculture Extension Service Foundation, Inc. (XAESFI) |
Php 200,000.00 |
July 2016 to July 2017 |
Closed |
|
Mangrove Forest Conservation through Continuous Enhancement Planting, Maintenance, and Protection |
Xavier Agricultural Expansion Service Foundation Inc. (XAESFI) |
200,000 |
August 2016 to May 2017 |
Closed |
|
Reduced Pollution through Alternatives and Indigenous Rehabilitation (RePAIR) of Silway River |
Mahintana Foundation, Inc. |
1,824,633.00 |
February 2012 to January 2013 |
Closed |
|
Scale-up Reduce Pollution through Alternative and Indigenous Rehabilitation of Silway River |
Mahintana Foundation Inc (MFI) |
2,000,000 |
January 2016 to January 2017 |
Closed |
|
Scale-up Reduced Pollution through Alternatives andIndigenous Reha bilitation (Scale-up REPAIR) of Silway River |
Mahintana Foundation, Inc. (MFI) |
Php 2,000,000 |
December 2015 to January 2016 |
Closed |
|
Scale-up Reduced Pollution through Vegetation and Rehabilitation (Scale-up REPAIR) of Silway River (Phase 3) |
Mahintana Foundation |
1,999,655.00 |
January 2017 to January 2018 |
Closed |
|
Scale-up Reduced Pollution through Vegetation and Rehabilitation (Scale-up REPAIR) of Silway River” (Phase 3) |
Mahintana Foundation |
Php1,999,655.50 |
February 2018 to February 2019 |
Closed |
|
Silway River Erosion/Flood Control Project |
Tribal Leaders Development Foundation |
PhP 723,675.00 |
November 2012 to December 2013 |
Closed |
|
Strengthening Management of the Bunawan Marine Protected Area (BMPA) in Davao Gulf Towards Biodiversity Conservation |
Association of Fisherfolk of Davao City, Inc. (AFDCI) |
1,580,695.00 |
June 2012 to July 2014 |
Closed |
NATIONAL |
Collaborative NGO Support on Ancestral Domain Management |
Anthropology Watch, Inc. |
1,996,125.00 |
October 2004 to September 2005 |
Closed |
|
Development of Sites and Site-Focused Program |
FPE NATIONAL AND LUZON OPERATIONS UNIT |
800,000 |
January 2017 to January 2018 |
Closed |
|
KAWAYANIHAN: A Community Bamboo Planting |
ALC Foundation, Inc. |
Php 100,000.00 |
June 2016 to August 2016 |
Closed |
|
Star Trek Project Phase 3 |
Palawan Center for Appropriate Rural Technology (PCART) |
1,993,363 |
January 2017 to January 2018 |
Closed |